Attention Rosebud Residents:

A new fire hydrant is scheduled to be installed on the north side of Severn Ave. and Erickson St. in Rosebud. Construction is set to take place from Wednesday, October 4, to Wednesday, October 18, 2023. Local water services will not be affected by this installation.

During this period, a small section of Severn Ave. will be temporarily closed from October 5 to October 10. Local traffic will be detoured south along the alley between Severn and Martin Ave. The contractor will ensure that local residents will continue to have access to their properties during construction.

Please adhere to all posted signage in the area throughout the construction period. Thank you for your cooperation.