fbpx
Skip to content Skip to main navigation Skip to footer

Notification of Gas Flaring

North 40 Resources Ltd (N40) is planning to temporarily flare natural gas as part of its routine
completion and production operations. This Flaring operation will be in accordance with good oilfield
practices as well as Alberta Energy Regulator regulations. Specific information relative to this project is
detailed below:

Site Supervisor: Gerald Aleman Contact Number: (403) 324-1500

Well Surface Flare Location: 05-05-028-19W4
Reason for Flaring: Well Clean up period
Expected Start Date: after July 26, 2021 Expected end date: September 10, 2021
Expected Flare Volume: +/- 15e3m3/day
Type of Well: Oil
H2S Present: Not in flare H2S Concentration: 0.0 ppm

AER Field Center: 310-0000 (toll free)
AER Midnapore 403-297-8303
AER Medicine Hat 403-527-3385

To adhere to Directive 60 regulations, all residents in the surrounding 1.5 km need to be notified of
flaring operations. If any H2S is present the radius is expanded. The time period above is based off
current weather conditions and timing. Once the well has reached burnable gas and it has been
accepted by the third party processor gas will be conserved or when the well has produced all the load
fluid back and the production has stabilized.

Should further information be required regarding the construction or operation of this project, please
contact Gerald Aleman at 403-324-1500 or (403) 974-6822.

North 40 Emergency 24 Hour Number 1(877)486-0472.

Back to top