Public Notice – TWP 250 Road Closure
TWP 250 from HWY 817 to east of RR 255 will be intermittently closed to through traffic from July 2 to early-September, 2026, for the duration of TWP 250 Phase 2 Paving.
It is recommended to avoid this section of TWP 250 during construction. Detour routes along TWP 244 and TWP 252 will be in effect, and access for local traffic and emergency vehicles will be available throughout the duration of the work.
Please follow all posted signage and speed limits in the area.