Notification of Gas Flaring: 06-10-028-19W4(F52309)
North 40 Resources Ltd (N40) is planning to temporarily flare natural gas as part of an outage at the
third party gas plant that N40’s gas is connected to. This Flaring operation will be in accordance with
good oilfield practices as well as Alberta Energy Regulator regulations. Specific information relative to
this project is detailed below:
Site Supervisor: Gerald Aleman Contact Number: (403) 324-1500
Well Surface Flare Location: 06-10-028-19W4(F52309)
Reason for Flaring: Third Party Gas Plant Maintenance
Expected Start Date: June 24, 2022 Expected end date: June 30, 2022
Expected Flare Volume: +/- 11 e3m3/day
Type of Well: Oil wells
H2S Present: Not in flare/vent H2S Concentration: 0.0 ppm
AER Field Center: 310-0000 (toll free)
AER Midnapore 403-297-8303
AER Medicine Hat 403-527-3385
To adhere to Directive 60 regulations, all residents in the surrounding 1.5 km need to be notified of
flaring operations. If any H2S is present the radius is expanded. The time period above is based off
current weather conditions and timing. This facility will be flared at this time.
Should further information be required regarding the construction or operation of this project, please
contact Gerald Aleman at 403-324-1500 or (403) 974-6822.
North 40 Emergency 24 Hour Number 1(877)486-0472.